Default Calculate parts per hour on rotating line

There is a 700 feet rotating conveyor.
Moving at a rate of 7.5 feet per minute.
I know it takes 93 minutes to make one revolution.

How long will it take to get 500 parts off the line?
The parts are spaced 1 foot apart.

I need a formula that can calculate this. Can somebody help me?
  #2   Report Post  
Posted to microsoft.public.excel.misc
external usenet poster
 
Posts: 22,906
Default Calculate parts per hour on rotating line

7.5 parts per minute.

=500/7.5 returns 66.66667 minutes


Gord Dibben MS Excel MVP

On Wed, 7 Apr 2010 09:46:06 -0700, scootr
wrote:

There is a 700 feet rotating conveyor.
Moving at a rate of 7.5 feet per minute.
I know it takes 93 minutes to make one revolution.

How long will it take to get 500 parts off the line?
The parts are spaced 1 foot apart.

I need a formula that can calculate this. Can somebody help me?


  #3   Report Post  
Posted to microsoft.public.excel.misc
dlw dlw is offline
external usenet poster
 
Posts: 510
Default Calculate parts per hour on rotating line

so, one part per foot, moving at 7.5 feet per minute, that means you are
getting 7.5 parts per minute, divide 500 parts by 7.5 parts per minute gives
you 66.6666666666666666 minutes to get 500 parts

"scootr" wrote:

There is a 700 feet rotating conveyor.
Moving at a rate of 7.5 feet per minute.
I know it takes 93 minutes to make one revolution.

How long will it take to get 500 parts off the line?
The parts are spaced 1 foot apart.

I need a formula that can calculate this. Can somebody help me?

  #4   Report Post  
Posted to microsoft.public.excel.misc
external usenet poster
 
Posts: 2,819
Default Calculate parts per hour on rotating line

Sounds like homework.

scootr wrote:

There is a 700 feet rotating conveyor.
Moving at a rate of 7.5 feet per minute.
I know it takes 93 minutes to make one revolution.

How long will it take to get 500 parts off the line?
The parts are spaced 1 foot apart.

I need a formula that can calculate this. Can somebody help me?


  #5   Report Post  
Posted to microsoft.public.excel.misc
external usenet poster
 
Posts: 833
Default Calculate parts per hour on rotating line

EXCEL 2007

I have just put up a file for you at:-

http://www.pierrefondes.com/

Item number 90 (at the time of posting).

You can change any of the input cells (I 13, K 13, M 16 or J 22) and the
result in minutes (cell M 26) will get calculated for you automatically.

If my comments have helped please hit Yes.

Thanks.





"scootr" wrote:

There is a 700 feet rotating conveyor.
Moving at a rate of 7.5 feet per minute.
I know it takes 93 minutes to make one revolution.

How long will it take to get 500 parts off the line?
The parts are spaced 1 foot apart.

I need a formula that can calculate this. Can somebody help me?



  #6   Report Post  
Posted to microsoft.public.excel.misc
external usenet poster
 
Posts: 9
Default Calculate parts per hour on rotating line

Naaa.
Not homework
Trying to develope a spreadsheet to automatically calculate total time
needed based on different speeds per minute, parts needed, and spacing apart.
I was just over-complecating things.

Thanks everyone.

"Bob I" wrote:

Sounds like homework.

scootr wrote:

There is a 700 feet rotating conveyor.
Moving at a rate of 7.5 feet per minute.
I know it takes 93 minutes to make one revolution.

How long will it take to get 500 parts off the line?
The parts are spaced 1 foot apart.

I need a formula that can calculate this. Can somebody help me?


.

  #7   Report Post  
Posted to microsoft.public.excel.misc
external usenet poster
 
Posts: 2,819
Default Calculate parts per hour on rotating line

remove the superfluous information and divide speed of belt by distance
between part to get quantity per minute then divide quantity desired by
part rate to find time.

scootr wrote:

Naaa.
Not homework
Trying to develope a spreadsheet to automatically calculate total time
needed based on different speeds per minute, parts needed, and spacing apart.
I was just over-complecating things.

Thanks everyone.

"Bob I" wrote:


Sounds like homework.

scootr wrote:


There is a 700 feet rotating conveyor.
Moving at a rate of 7.5 feet per minute.
I know it takes 93 minutes to make one revolution.

How long will it take to get 500 parts off the line?
The parts are spaced 1 foot apart.

I need a formula that can calculate this. Can somebody help me?


.


Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
can you have sub parts relating to a line JJINTY Excel Worksheet Functions 1 December 4th 09 10:42 PM
Rotating a line chart? Roe Charts and Charting in Excel 2 August 30th 06 04:29 AM
Rotating dotted line around copied cell RGD Excel Discussion (Misc queries) 0 May 17th 06 11:15 PM
How do I set up a formula for parts (or units) per hour? Ender-DI Excel Worksheet Functions 10 April 13th 06 12:35 PM
rotating 12 hour schedule shared with 3, one weekend off monthly koalabusdriver Excel Discussion (Misc queries) 1 March 1st 05 02:17 PM


All times are GMT +1. The time now is 01:37 PM.

Powered by vBulletin® Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 ExcelBanter.
The comments are property of their posters.
 

About Us

"It's about Microsoft Excel"