There is a 700 feet rotating conveyor.
Moving at a rate of 7.5 feet per minute. I know it takes 93 minutes to make one revolution. How long will it take to get 500 parts off the line? The parts are spaced 1 foot apart. I need a formula that can calculate this. Can somebody help me? |
#2
Posted to microsoft.public.excel.misc
|
|||
|
|||
Calculate parts per hour on rotating line
7.5 parts per minute.
=500/7.5 returns 66.66667 minutes Gord Dibben MS Excel MVP On Wed, 7 Apr 2010 09:46:06 -0700, scootr wrote: There is a 700 feet rotating conveyor. Moving at a rate of 7.5 feet per minute. I know it takes 93 minutes to make one revolution. How long will it take to get 500 parts off the line? The parts are spaced 1 foot apart. I need a formula that can calculate this. Can somebody help me? |
#3
Posted to microsoft.public.excel.misc
|
|||
|
|||
Calculate parts per hour on rotating line
so, one part per foot, moving at 7.5 feet per minute, that means you are
getting 7.5 parts per minute, divide 500 parts by 7.5 parts per minute gives you 66.6666666666666666 minutes to get 500 parts "scootr" wrote: There is a 700 feet rotating conveyor. Moving at a rate of 7.5 feet per minute. I know it takes 93 minutes to make one revolution. How long will it take to get 500 parts off the line? The parts are spaced 1 foot apart. I need a formula that can calculate this. Can somebody help me? |
#4
Posted to microsoft.public.excel.misc
|
|||
|
|||
Calculate parts per hour on rotating line
Sounds like homework.
scootr wrote: There is a 700 feet rotating conveyor. Moving at a rate of 7.5 feet per minute. I know it takes 93 minutes to make one revolution. How long will it take to get 500 parts off the line? The parts are spaced 1 foot apart. I need a formula that can calculate this. Can somebody help me? |
#5
Posted to microsoft.public.excel.misc
|
|||
|
|||
Calculate parts per hour on rotating line
EXCEL 2007
I have just put up a file for you at:- http://www.pierrefondes.com/ Item number 90 (at the time of posting). You can change any of the input cells (I 13, K 13, M 16 or J 22) and the result in minutes (cell M 26) will get calculated for you automatically. If my comments have helped please hit Yes. Thanks. "scootr" wrote: There is a 700 feet rotating conveyor. Moving at a rate of 7.5 feet per minute. I know it takes 93 minutes to make one revolution. How long will it take to get 500 parts off the line? The parts are spaced 1 foot apart. I need a formula that can calculate this. Can somebody help me? |
#6
Posted to microsoft.public.excel.misc
|
|||
|
|||
Calculate parts per hour on rotating line
Naaa.
Not homework Trying to develope a spreadsheet to automatically calculate total time needed based on different speeds per minute, parts needed, and spacing apart. I was just over-complecating things. Thanks everyone. "Bob I" wrote: Sounds like homework. scootr wrote: There is a 700 feet rotating conveyor. Moving at a rate of 7.5 feet per minute. I know it takes 93 minutes to make one revolution. How long will it take to get 500 parts off the line? The parts are spaced 1 foot apart. I need a formula that can calculate this. Can somebody help me? . |
#7
Posted to microsoft.public.excel.misc
|
|||
|
|||
Calculate parts per hour on rotating line
remove the superfluous information and divide speed of belt by distance
between part to get quantity per minute then divide quantity desired by part rate to find time. scootr wrote: Naaa. Not homework Trying to develope a spreadsheet to automatically calculate total time needed based on different speeds per minute, parts needed, and spacing apart. I was just over-complecating things. Thanks everyone. "Bob I" wrote: Sounds like homework. scootr wrote: There is a 700 feet rotating conveyor. Moving at a rate of 7.5 feet per minute. I know it takes 93 minutes to make one revolution. How long will it take to get 500 parts off the line? The parts are spaced 1 foot apart. I need a formula that can calculate this. Can somebody help me? . |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
Similar Threads | ||||
Thread | Forum | |||
can you have sub parts relating to a line | Excel Worksheet Functions | |||
Rotating a line chart? | Charts and Charting in Excel | |||
Rotating dotted line around copied cell | Excel Discussion (Misc queries) | |||
How do I set up a formula for parts (or units) per hour? | Excel Worksheet Functions | |||
rotating 12 hour schedule shared with 3, one weekend off monthly | Excel Discussion (Misc queries) |