Calculate parts per hour on rotating line
Naaa.
Not homework
Trying to develope a spreadsheet to automatically calculate total time
needed based on different speeds per minute, parts needed, and spacing apart.
I was just over-complecating things.
Thanks everyone.
"Bob I" wrote:
Sounds like homework.
scootr wrote:
There is a 700 feet rotating conveyor.
Moving at a rate of 7.5 feet per minute.
I know it takes 93 minutes to make one revolution.
How long will it take to get 500 parts off the line?
The parts are spaced 1 foot apart.
I need a formula that can calculate this. Can somebody help me?
.
|