LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #1   Report Post  
Greg Snidow
 
Posts: n/a
Default Date controlled function execution

Does anyone know of a way to make a cell function occur on a schedule. I
have a spreadsheet where the contents of a cell on one worksheet are
transferred to a cell on another worksheet once a week. If someone forgets
to manually do this it makes analysis rather troublesome. I would like this
to happen automatically on a schedule. Is this possible?
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Excel 2003: can I insert a "last edited" date function? KTK Excel Worksheet Functions 1 June 27th 05 11:59 PM
Is there a function to show future date taxmom Excel Worksheet Functions 2 March 4th 05 09:23 PM
Date Function Michael Excel Worksheet Functions 2 February 17th 05 07:52 PM
Date Function drschieff Excel Worksheet Functions 1 January 19th 05 07:51 PM
Formula for date function Markitos Excel Worksheet Functions 15 November 10th 04 02:05 AM


All times are GMT +1. The time now is 03:10 PM.

Powered by vBulletin® Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 ExcelBanter.
The comments are property of their posters.
 

About Us

"It's about Microsoft Excel"