I currently have an Excel 2000 worksheet which tracks a project using
NETWORKDAYS to calculate the number of days taken between the start and end
date of the project.

However, I now need to have a column which shows a running total of
NETWORKDAYS taken so far (so there will be no end date) and when it reaches
15 days the number changes to red.

Can anyone help before I loose face.

Thank you for your assistance.
Suzanne
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
NETWORKDAYS Trouvera52 Excel Worksheet Functions 2 October 14th 06 12:21 AM
networkdays rsenn Excel Worksheet Functions 0 November 24th 05 12:42 AM
Networkdays DKerr Excel Worksheet Functions 1 September 28th 05 03:30 PM
NETWORKDAYS sinbad Excel Worksheet Functions 2 July 19th 05 12:32 PM
Networkdays Susan Hayes Excel Worksheet Functions 1 April 5th 05 06:33 PM


All times are GMT +1. The time now is 05:48 PM.

Powered by vBulletin® Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 ExcelBanter.
The comments are property of their posters.
 

About Us

"It's about Microsoft Excel"