Home |
Search |
Today's Posts |
#1
![]()
Posted to microsoft.public.excel.programming
|
|||
|
|||
![]()
I've developed a macro with a calendar control and it works fine on my PC
running windows XP and calendar version 10. When I run the macro on another amchine running windows 2000 pro and calendar version 8.0 the calendar shows up but with dots where the day numbers should be. I assume I should update the version of the calendar control. How can I do this? thanks. |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Control disappeared problem - specifically, the Calendar Control | Excel Programming | |||
Use the Calendar control to fill in dates on de Bruin (last update 19 April 2004) | Excel Programming | |||
calendar control | Excel Programming | |||
Calendar Control: Can't exit design mode because control can't be created | Excel Programming | |||
How do I update calendar control 8.0 to 10.0 | Excel Programming |