LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #1   Report Post  
george
 
Posts: n/a
Default calculation of pounds per hour

I am trying to create a formula that calculates production pounds per hour.
i have start time and stop time numbers that correctly return hours run in a
format of 00:00:00 (which is what i want). when calclating pounds per hour,
the time format in excel brings back an incorrect answer. i.e. A1=31,212
pounds produced, B1=15:10:00 (total runtime). A1/B1 brings and incorrect
answer of 49,390.4178. the answer should be in the 2 thousand range. please
help.
--
george
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
How do I calculation time in excel in 24 hour method Lloyd Excel Discussion (Misc queries) 7 July 18th 05 08:43 AM
Calculation Setting in Excel Stuart Bisset Excel Discussion (Misc queries) 0 June 17th 05 09:54 AM
How do I use a rounded calculation result in another calculation? vnsrod2000 Excel Worksheet Functions 1 January 26th 05 10:11 PM
Is there a formula to spell out a number in excel? Sha-nay-nay Excel Worksheet Functions 2 December 18th 04 09:25 PM
Convert Numeric into Text Monty Excel Worksheet Functions 0 December 18th 04 09:25 PM


All times are GMT +1. The time now is 01:09 AM.

Powered by vBulletin® Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 ExcelBanter.
The comments are property of their posters.
 

About Us

"It's about Microsoft Excel"