Production CLock
Hi
I am creating a sheet that acts as a production clock and works out various factors that can change for work. I need help in several areas the production item has two clocks running simultaneously and as I cannot post my sheet I will try to explain what I mean. Product item I will call X X arrives say at 13:00 hrs today it has to be out within 24 hrs exactly I need a cell to add on 24 hours which shows the date and time known as Relevant Out date / time. During the 24 hours X may be transferred to another facility so I have to show that X is transfers out (I enter this cell with time out) & X could be away 3 hrs or 3 days. The relevant time will freeze until X returns and the time out will be submitted from the clock. E.g. So if X goes for 4 hours then 4 hours needs to be added to the relevant time so we still get 24 hours production time. If he goes for 3 days then this needs to be taken into account. The other area is a manager can add a further 1 to 12 hours if X needs more production time. So I have a cell that I add 1 or 3 or 12 what ever the manager agrees. This if entered would add to the Relevant Out date / time. So for the second clock running this is the movement clock and this comes into place when X is booked onto the production area. This can be 10 minutes after he arrival clock or 4 hours so it has to be a separate clock. So say X arrives as above 13:00 hrs but does not hit the production line for 1 hour 14:00 hrs. From this production review times are needed the 1st review is 6 hrs after so in this case it would be 2000 hrs the 2 further reviews at 9 hour intervals, which is simple enough. But it becomes complicated as the reviews can be brought forward due to availability of managers on nights and other matters. So I would have cells with the correct format of 6 ,9,9 added but underneath I need the actual times they are done and the calculation to be if a review is brought forward say the review was done a 19:00 hrs instead of 20:00 hrs then the 2nd review would be 9 hours after 19:00 hrs. But if the review is late say at 21:00 hrs then the 2 nd review will be 9 hours after 20:00 hrs the original time. If I can get the barebones of this clock working it would be great a lot of the times have to work with the date as well but I would like not to keep repeating the dates. The only date I would like to enter would be Arrival Date , Booked in Production Date and hospital date. But I need all the time cells to know the date if that makes sense. Please can you help me with the formulas if you need a copy of the spreadsheet please email me Cheers Dale |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
Similar Threads | ||||
Thread | Forum | |||
Start Clock/Stop Clock | Excel Discussion (Misc queries) | |||
clock | Excel Worksheet Functions | |||
percentage of production against quotation | Excel Discussion (Misc queries) | |||
Formating Dates for production schedule | Excel Discussion (Misc queries) | |||
Excel application as an ERP platform for medium size production plan | Excel Discussion (Misc queries) |