Default FORECAST function in simple terms, plz...

I need help understanding the FORECAST function in simple terms (if
possible). Do I have this straight?
Let's say I have 9 periods of history, and I want to forecast what will
happen in the 10th. I have the periods listed as numbers (1,2,3...) in
A1:A9, with period 10 in A10. Then I have the historical data for each
period in B1:B9. I put the following in cell B10:
=FORECAST(A10,B1:B9,A1:A9)
Have I used this function correctly to predict a forecast of what will
happen in period 10? Does it extrapolate between periods if I have some
missing? For instance, if I'm missing period 5, will it still calculate 10
based on an estimate of what 5 "should be"?
Thanks in advance.
  #2   Report Post  
Posted to microsoft.public.excel.worksheet.functions
external usenet poster
 
Posts: 762
Default FORECAST function in simple terms, plz...

Ray Pendergast -

The FORECAST worksheet function assumes a linear relationship. Before using
the FORECAST function, you should first use an XY (Scatter) chart to plot
the data and verify that a linear relationship is appropriate. If you do
plot the data, you can obtain the same results using the Add Trendline
feature.

Assuming a linear relationship is appropriate, the answer to each of your
three questions is "yes." The "should be" will be based on an average linear
relationship based on the other values.

- Mike
http://www.mikemiddleton.com

"Ray Pendergast" wrote in message
...
I need help understanding the FORECAST function in simple terms (if
possible). Do I have this straight?
Let's say I have 9 periods of history, and I want to forecast what will
happen in the 10th. I have the periods listed as numbers (1,2,3...) in
A1:A9, with period 10 in A10. Then I have the historical data for each
period in B1:B9. I put the following in cell B10:
=FORECAST(A10,B1:B9,A1:A9)
Have I used this function correctly to predict a forecast of what will
happen in period 10? Does it extrapolate between periods if I have some
missing? For instance, if I'm missing period 5, will it still calculate
10
based on an estimate of what 5 "should be"?
Thanks in advance.



Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Very simple function not working ScoTTyBEEE Excel Discussion (Misc queries) 3 October 21st 05 05:43 PM
simple if then function amy Excel Worksheet Functions 4 July 6th 05 05:36 PM
clock Wildman Excel Worksheet Functions 2 April 26th 05 10:31 AM
Simple, Monday morning brain function craigwojo Excel Worksheet Functions 1 November 16th 04 03:07 AM
Simple, Monday morning brain function craigwojo Excel Worksheet Functions 2 November 15th 04 01:43 PM


All times are GMT +1. The time now is 12:58 PM.

Powered by vBulletin® Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 ExcelBanter.
The comments are property of their posters.
 

About Us

"It's about Microsoft Excel"