Home |
Search |
Today's Posts |
#1
![]()
Posted to microsoft.public.excel.programming
|
|||
|
|||
![]()
I have some 2007 applications that crash in 2010 because of a missing
calendar control. I have userforms in 2007 on which I have added the additional control, called Calendar Control in Excel 2007. It causes the code to crash when run in 2010, and the References shows it as missing. I saw a post here from Ron Debruin, from whom I have learned a lot, and in whom I have great confidence, saying the calendar conrol was working in 2010. But it is not working for me. Is there an additonal control or referenence I need to add to make it work? I see MS Project calendar control and a handful of MS Works calendar controls, but, those that I have tried don't help. Thanks Ken |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
How can I set up a pop-up calendar for 2010 in Excel? | Excel Discussion (Misc queries) | |||
Calendar Control for Excel 2010 | Excel Programming | |||
Trouble adding text in 2009-2010 academic calendar | Excel Discussion (Misc queries) | |||
click on calendar control calendar but want to return the DAY of | Excel Programming | |||
Calendar Control: Can't exit design mode because control can't be created | Excel Programming |