LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #1   Report Post  
Posted to microsoft.public.excel.programming
external usenet poster
 
Posts: 114
Default Plotting duration of activity on a graph

Hi,

I need to add the following data to a graph.

Activity Time (secs)
pick 1
read 2
walk 9
pick 2


I need the chart to display the first instance of pick for 1 second,
along the time axis, then plot the next value (read) for two seconds,
and so on. However, I want either oe continuous bar or column, or a
three stage plot on the chart so I can see the different activities
over time. Sorry I've not explained myself very well. It would
basically look like a stacked chart, but without all the instances of
the same activity added together.

Hope you can help?

Matt

 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Alert if the travel activity is after the work activity Go Bucks!!! Excel Worksheet Functions 3 September 11th 09 05:44 PM
activity duration -jawad Setting up and Configuration of Excel 1 August 27th 07 01:18 AM
activity duration -jawad Excel Programming 3 August 26th 07 04:49 PM
Plotting a Graph Mayank Excel Discussion (Misc queries) 2 June 9th 06 08:12 PM
Graph plotting Dovla Excel Programming 0 September 9th 04 02:05 PM


All times are GMT +1. The time now is 06:55 AM.

Powered by vBulletin® Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 ExcelBanter.
The comments are property of their posters.
 

About Us

"It's about Microsoft Excel"