Home |
Search |
Today's Posts |
#4
![]()
Posted to microsoft.public.excel.misc
|
|||
|
|||
![]()
If that don't beat all............pretty cool Mike
Vaya con Dios, Chuck, CABGx3 "Mike H" wrote in message ... Hi, With your start date in a1, put this in B1 and drag down =WORKDAY(A1,1) If you get the name error then Tools\Addins and check the analysis toolpak or without the ATP =A1+1+CHOOSE(WEEKDAY(A1+1,2),0,0,0,0,0,2,1) Mike "Confusicous" wrote: I need to start with the date 12/28/2009 (monday) and drag down to 12/31/2010 (Friday) but I need to skip Saturday and Sunday. Is there an easy way to do this? |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
formula to look at current date and markdown date to give price | Excel Discussion (Misc queries) | |||
Create a formula in a date range to locate a specific date - ecel | Excel Discussion (Misc queries) | |||
Excel Formula to calulate number of days passed from date to date | Excel Discussion (Misc queries) | |||
Formula for determining if two date columns fall within specific date range | Excel Worksheet Functions | |||
Formula for determining if two date columns fall within specific date range | Excel Discussion (Misc queries) |