Fill in the blanks to smooth my projection curve
I know:
The dates I am going to be working, the month of December. The Total number of Welds I need to complete, 2000. The Date I start at 0 welds, 12/1/06 The Date I think I'll be half way done, 12/12/06 The date I think I'll be 90% done, 12/26/06 The Date I think I'll finish, 12/31/06 How do I fill in the cumulative data between my "known" values? Is there a way I can apply a log rhythmic distribution curve to my total to calculate them all? |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
Similar Threads | ||||
Thread | Forum | |||
Fill column blanks from last non-blank cell | Excel Discussion (Misc queries) | |||
How do I auto fill long col. filling blanks with last filled cell | Excel Discussion (Misc queries) | |||
How do I auto fill blanks cells immediately below with the same i. | Excel Discussion (Misc queries) | |||
Generate a smooth curve from uneven data points in a "stepped" co. | Excel Worksheet Functions | |||
Identifying the Active Fill Color | Excel Discussion (Misc queries) |