Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1   Report Post  
Posted to microsoft.public.excel.misc
external usenet poster
 
Posts: 1
Default Fill in the blanks to smooth my projection curve

I know:

The dates I am going to be working, the month of December.
The Total number of Welds I need to complete, 2000.
The Date I start at 0 welds, 12/1/06
The Date I think I'll be half way done, 12/12/06
The date I think I'll be 90% done, 12/26/06
The Date I think I'll finish, 12/31/06

How do I fill in the cumulative data between my "known" values?
Is there a way I can apply a log rhythmic distribution curve to my total to
calculate them all?
Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Fill column blanks from last non-blank cell C. BROWN Excel Discussion (Misc queries) 2 August 28th 06 08:36 PM
How do I auto fill long col. filling blanks with last filled cell MBBeginner Excel Discussion (Misc queries) 3 January 15th 06 12:44 AM
How do I auto fill blanks cells immediately below with the same i. leo Excel Discussion (Misc queries) 2 March 16th 05 06:03 PM
Generate a smooth curve from uneven data points in a "stepped" co. [email protected] Excel Worksheet Functions 1 December 29th 04 02:07 AM
Identifying the Active Fill Color Steve Conary Excel Discussion (Misc queries) 3 December 9th 04 04:45 AM


All times are GMT +1. The time now is 01:43 PM.

Powered by vBulletin® Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 ExcelBanter.
The comments are property of their posters.
 

About Us

"It's about Microsoft Excel"