Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1   Report Post  
Posted to microsoft.public.excel.charting
rod
 
Posts: n/a
Default cnc machine work load

I would like to have a graph or chart that would show cnc machine work
load per machine .
Number of hours and minutes that are required to complete scheduled work .
Lets say 2 machines involved,, laser1 and laser2 .

So 2 directory's ,, laser1 and laser1 .
Each directory could have 5 to 15 programs each ready to run .
Files are text files .. just G-code .

Example p1234, p2234,p3344 .

Inside top few lines of each program would have the info required to fill
the excel chart..
example of program

%
P1234
( Machine : laser1 )
( Program name : P1234 )
( Post date : 02/25/06 )
( Required run time : 2:12:20 )
( Sheets required : 1 )

Line 6 of program would be multiplied by line 7 for total run time if
program is required to repeat.

Thanks
Rod








Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Converting Date to Work Week... PokerZan Excel Discussion (Misc queries) 4 September 1st 05 09:47 PM
column to column conditional formatting won't work, need formula rrupp Excel Worksheet Functions 1 August 23rd 05 10:06 PM
Visible rows and functions that work tracy Excel Worksheet Functions 2 August 19th 05 05:25 AM
Tab key don't work in unprotected cells in a protected sheet Chad Excel Discussion (Misc queries) 0 August 16th 05 02:00 AM
How to get saved old saved work that was saved over? Maral Excel Discussion (Misc queries) 1 February 20th 05 08:59 PM


All times are GMT +1. The time now is 02:39 AM.

Powered by vBulletin® Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 ExcelBanter.
The comments are property of their posters.
 

About Us

"It's about Microsoft Excel"