LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #1   Report Post  
Posted to microsoft.public.excel.worksheet.functions
external usenet poster
 
Posts: 2
Default Using Networkdays with negative numbers

say i have 3 columns <ID <Est Finish Date and <Actual Finish Date and I
want an extra column that tells me how many working days before or after the
estimated finish date the actual finish date is. I used Networkdays and it
gave me the number of days after the estimated date minus the weekends,
however when the actual date was before the estimated date the formula still
counted the weekends.

Does anyone know a way of stopping this from happening?
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Counting networkdays with negative number Miranda Excel Worksheet Functions 1 February 9th 07 02:16 PM
Excel 2002 : Convert Positive Numbers to Negative Numbers ? Mr. Low Excel Discussion (Misc queries) 2 November 6th 06 03:30 PM
Set negative numbers to zero. Do not calculate with negative valu Excel Headache Excel Discussion (Misc queries) 4 September 14th 06 08:56 PM
change 2000 cells (negative numbers) into positive numbers lisbern Excel Worksheet Functions 2 August 16th 06 05:54 PM
Excel Formula - Add column of numbers but ignore negative numbers view for Distribution List members Excel Worksheet Functions 1 April 7th 06 03:13 AM


All times are GMT +1. The time now is 05:45 PM.

Powered by vBulletin® Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 ExcelBanter.
The comments are property of their posters.
 

About Us

"It's about Microsoft Excel"