Home |
Search |
Today's Posts |
#1
Posted to microsoft.public.excel.worksheet.functions
|
|||
|
|||
ogh, why is this not working
=INDEX(P2:P58,MATCH(1,(H7=O2:O58)*(L1=N2:N58),0))
OK, there are two colums of data that are required to generate the correct response. To make it easier lets say A1 is a drop down with 5 entries all text Promo.Kit, NRO.Kit, ect. In B1 there is second drop list, that is dependet on the first. In this drop down there are a serious of sizes that cororlate with the type of promo kit. ie. 11x8, 8.5x11 ect. With these two entiers I need to fill in C1 and then D1, with additional sizes that correlate with A1 and B2. The are agian like 11x by 8.5 ect.. The array would then be. e1 f1 g1 h1 Kit type Trim Size Bleed live Area Promo 5x7 5.25x7 4.5x10 NRO 5x7 and so on so basically the index match formula nees to produce a bleed size and live area based on the kit type and trim Please advise |
#2
Posted to microsoft.public.excel.worksheet.functions
|
|||
|
|||
ogh, why is this not working
See http://www.contextures.com/xlFunctio...ml#IndexMatch4 for a solution...
" wrote: =INDEX(P2:P58,MATCH(1,(H7=O2:O58)*(L1=N2:N58),0)) OK, there are two colums of data that are required to generate the correct response. To make it easier lets say A1 is a drop down with 5 entries all text Promo.Kit, NRO.Kit, ect. In B1 there is second drop list, that is dependet on the first. In this drop down there are a serious of sizes that cororlate with the type of promo kit. ie. 11x8, 8.5x11 ect. With these two entiers I need to fill in C1 and then D1, with additional sizes that correlate with A1 and B2. The are agian like 11x by 8.5 ect.. The array would then be. e1 f1 g1 h1 Kit type Trim Size Bleed live Area Promo 5x7 5.25x7 4.5x10 NRO 5x7 and so on so basically the index match formula nees to produce a bleed size and live area based on the kit type and trim Please advise |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
Similar Threads | ||||
Thread | Forum | |||
Calculate working days but change working week | Excel Discussion (Misc queries) | |||
Making weekend days working days - the system cuts the working tim | Excel Discussion (Misc queries) | |||
SUM not working | Excel Worksheet Functions | |||
if not working | Excel Discussion (Misc queries) | |||
Why is this not working? | Excel Discussion (Misc queries) |