I am trying to find the actual cycle time of issues as they pass through
different stages. I have attached a sample spreadsheet.

In the example below Colum A lists the different states that an issue can
reside in. Column B is the date when the issue was first identified. Colum C
through I are the time stamps for when the particular issue reaches that
state. Column J is the numbers of days that the issue resides in a last known
state.

The current method that I use is to find the P90 for all complaints in the
€śNew€ť state is just look at all open issues in the €śNew€ť state at the end of
the week, sum up the days in state and get the P90.The problem here is that I
am ignoring the issues that moved from the New to another state during the
same week.

I would to have a way to compare the created date (column B) to the last
entered date in any state from column C through I and then if the €śWEEKNUM€ť
for these two states is the same, find the actual number of days between them
and add that to my P90 calculations.

From my example the P90 for all issues that was in the €śNew€ť state during
weeknum 14 should be 8.5. If I just look at the issues that are still in the
open state at the end of the week the P90 shows up as 10.95.

The sample should be pasted in a spreadsheet to get the right format.

State Created date A1 Date B1 Date C1 Date D1 Date E1 Date F1 Date G1
Date Days in state
New 20-Mar-08 12
New 31-Mar-08 5
State B 01-Apr-08 01-Apr-08 4
State G 01-Apr-08 01-Apr-08 4
State B 01-Apr-08 03-Apr-08 4
State B 02-Apr-08 03-Apr-08 3
New 03-Apr-08 2
State G 03-Apr-08 04-Apr-08 04-Apr-08 04-Apr-08 2
State D 04-Apr-08 04-Apr-08 1
New 04-Apr-08 1
State B 05-Apr-08 05-Apr-08 0



Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Cycle Time if in a Specific Year PAL Excel Worksheet Functions 2 January 16th 08 06:59 PM
cycle time out of range error Access lightweight Excel Discussion (Misc queries) 1 January 15th 08 04:58 PM
Time Cycle Antonio Excel Discussion (Misc queries) 7 December 3rd 07 11:01 PM
Time difference calculations, daylight savings time, Excel Tim Excel Discussion (Misc queries) 1 December 28th 06 04:18 PM
How do I keep result from 1 iteration cycle to use in next cycle? sgl8akm Excel Discussion (Misc queries) 0 July 27th 06 08:28 PM


All times are GMT +1. The time now is 02:58 PM.

Powered by vBulletin® Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 ExcelBanter.
The comments are property of their posters.
 

About Us

"It's about Microsoft Excel"