Home |
Search |
Today's Posts |
#1
Posted to microsoft.public.excel.worksheet.functions
|
|||
|
|||
Cycle Time Calculations
Hi
I am trying to find the actual cycle time of issues as they pass through different stages. I have attached a sample spreadsheet. In the example below Colum A lists the different states that an issue can reside in. Column B is the date when the issue was first identified. Colum C through I are the time stamps for when the particular issue reaches that state. Column J is the numbers of days that the issue resides in a last known state. The current method that I use is to find the P90 for all complaints in the €śNew€ť state is just look at all open issues in the €śNew€ť state at the end of the week, sum up the days in state and get the P90.The problem here is that I am ignoring the issues that moved from the New to another state during the same week. I would to have a way to compare the created date (column B) to the last entered date in any state from column C through I and then if the €śWEEKNUM€ť for these two states is the same, find the actual number of days between them and add that to my P90 calculations. From my example the P90 for all issues that was in the €śNew€ť state during weeknum 14 should be 8.5. If I just look at the issues that are still in the open state at the end of the week the P90 shows up as 10.95. The sample should be pasted in a spreadsheet to get the right format. State Created date A1 Date B1 Date C1 Date D1 Date E1 Date F1 Date G1 Date Days in state New 20-Mar-08 12 New 31-Mar-08 5 State B 01-Apr-08 01-Apr-08 4 State G 01-Apr-08 01-Apr-08 4 State B 01-Apr-08 03-Apr-08 4 State B 02-Apr-08 03-Apr-08 3 New 03-Apr-08 2 State G 03-Apr-08 04-Apr-08 04-Apr-08 04-Apr-08 2 State D 04-Apr-08 04-Apr-08 1 New 04-Apr-08 1 State B 05-Apr-08 05-Apr-08 0 |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
Similar Threads | ||||
Thread | Forum | |||
Cycle Time if in a Specific Year | Excel Worksheet Functions | |||
cycle time out of range error | Excel Discussion (Misc queries) | |||
Time Cycle | Excel Discussion (Misc queries) | |||
Time difference calculations, daylight savings time, Excel | Excel Discussion (Misc queries) | |||
How do I keep result from 1 iteration cycle to use in next cycle? | Excel Discussion (Misc queries) |