I am attempting to build a spreadsheet to manage attendance based pay for a
TA (National Guard equiv) squadron.
Soldiers will be marked in either 0.25, .5, .75 or 1 for the percentage of
working day attended and I want to produce a sum per month and rolling year
however when I try to add the values of 31 cells Excel 2002 tells me I am
entering too many arguments for Sum. To make things a little harder the cells
for the dates are not next to each other so the formula should look like this
=SUM(BO3,BM3,BK3,BI3,BG3,BE3,BC3,BA3,AY3,AW3,AU3,A S3,AQ3,AO3,AM3,AK3,AI3,AG3,AE3,AC3,AA3,Y3,W3,U3,S3 ,Q3,O3,M3,K3,I3,G3)

Am I trying to do this the hard way ?

Thanks Paul
  #2   Report Post  
Posted to microsoft.public.excel.worksheet.functions
external usenet poster
 
Posts: 36
Default attendance based pay for Army reserve

Split it in two:
=SUM(BO3,BM3,BK3,BI3,BG3,BE3,BC3,BA3,AY3,AW3,AU3,A S3)+SUM(AQ3,AO3,AM3,AK3,AI3,AG3,AE3,AC3,AA3,Y3,W3, U3,S3,Q3,O3,M3,K3,I3,G3)

Probably is a better way, but's 5pm and I'm tired :)

"Paul" wrote:

I am attempting to build a spreadsheet to manage attendance based pay for a
TA (National Guard equiv) squadron.
Soldiers will be marked in either 0.25, .5, .75 or 1 for the percentage of
working day attended and I want to produce a sum per month and rolling year
however when I try to add the values of 31 cells Excel 2002 tells me I am
entering too many arguments for Sum. To make things a little harder the cells
for the dates are not next to each other so the formula should look like this
=SUM(BO3,BM3,BK3,BI3,BG3,BE3,BC3,BA3,AY3,AW3,AU3,A S3,AQ3,AO3,AM3,AK3,AI3,AG3,AE3,AC3,AA3,Y3,W3,U3,S3 ,Q3,O3,M3,K3,I3,G3)

Am I trying to do this the hard way ?

Thanks Paul

  #3   Report Post  
Posted to microsoft.public.excel.worksheet.functions
external usenet poster
 
Posts: 341
Default attendance based pay for Army reserve

hey paul

i suggest sumif but you will have to make a small change to your sheet

in row 2 (for example), put an "Y" in each of the columns that you are going
to sum up

then you can use

=SUMIF(G2:BO2,"Y",G3:BO3)

you could call this row something like "relevant for SUMIF"
--
Allllen


"Paul" wrote:

I am attempting to build a spreadsheet to manage attendance based pay for a
TA (National Guard equiv) squadron.
Soldiers will be marked in either 0.25, .5, .75 or 1 for the percentage of
working day attended and I want to produce a sum per month and rolling year
however when I try to add the values of 31 cells Excel 2002 tells me I am
entering too many arguments for Sum. To make things a little harder the cells
for the dates are not next to each other so the formula should look like this
=SUM(BO3,BM3,BK3,BI3,BG3,BE3,BC3,BA3,AY3,AW3,AU3,A S3,AQ3,AO3,AM3,AK3,AI3,AG3,AE3,AC3,AA3,Y3,W3,U3,S3 ,Q3,O3,M3,K3,I3,G3)

Am I trying to do this the hard way ?

Thanks Paul

  #4   Report Post  
Posted to microsoft.public.excel.worksheet.functions
external usenet poster
 
Posts: 3,268
Default attendance based pay for Army reserve

It looks like you are summing every other cell from G3 to BO3, if that's the
case this will work


=SUMPRODUCT(--(MOD(COLUMN(G3:BO3),2)=1),G3:BO3)


otherwise you can just use some extra parenthesis


=SUM((BO3,BM3,BK3,BI3,BG3,BE3,BC3,BA3,AY3,AW3,AU3, AS3,AQ3,AO3,AM3,AK3,AI3,AG3,AE3,AC3,AA3,Y3,W3,U3,S 3,Q3,O3,M3,K3,I3,G3))


if you add an extra parenthesis for each 30 arguments but given your example
my first formula will work


--


Regards,


Peo Sjoblom





"Paul" wrote in message
...
I am attempting to build a spreadsheet to manage attendance based pay for a
TA (National Guard equiv) squadron.
Soldiers will be marked in either 0.25, .5, .75 or 1 for the percentage of
working day attended and I want to produce a sum per month and rolling
year
however when I try to add the values of 31 cells Excel 2002 tells me I am
entering too many arguments for Sum. To make things a little harder the
cells
for the dates are not next to each other so the formula should look like
this
=SUM(BO3,BM3,BK3,BI3,BG3,BE3,BC3,BA3,AY3,AW3,AU3,A S3,AQ3,AO3,AM3,AK3,AI3,AG3,AE3,AC3,AA3,Y3,W3,U3,S3 ,Q3,O3,M3,K3,I3,G3)

Am I trying to do this the hard way ?

Thanks Paul




Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
attendance log gloria's day care New Users to Excel 1 February 5th 07 05:05 PM
Need to create attendance tracking based on % and 2080 hours/year Choateb Excel Discussion (Misc queries) 0 July 10th 06 08:03 PM
Download An Open Letter From Al-RASHEDEEN Army To The American President qqqqqqq Excel Worksheet Functions 1 April 12th 06 05:31 PM
*Salvation Army* Importing information from one workbook to another Robert Sadler Excel Discussion (Misc queries) 4 February 8th 06 03:29 PM
How do I set up a equipment replacement reserve schedule Hank Excel Worksheet Functions 0 March 30th 05 07:19 PM


All times are GMT +1. The time now is 10:16 AM.

Powered by vBulletin® Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 ExcelBanter.
The comments are property of their posters.
 

About Us

"It's about Microsoft Excel"