I am trying to set up a tracking schedule for vehicle repair. I need to set
a time line to track initial work, when to order parts, when to schedule the work etc. Basically I want column A to be the start or work request , all the way to column J to be the start of work. In between will be target dates. So A will be lets say 180 days from J. And in between A-J will be other target dates that are critical to planning of the work and ordering parts. |
#2
![]()
Posted to microsoft.public.excel.worksheet.functions
|
|||
|
|||
![]()
Simply enter the first date involved into a cell (A1) then other cells can
either base their dates on it, as =A1 + 5 for 5 days after A1 or even on a second, calculated date: in B1 perhaps is =A1+5 (5 days after date in A1) somewhere else = B1 + 4 (4 days after date in B1 [9 days after date in A1]) Does that help any? "Harlet Rider" wrote: I am trying to set up a tracking schedule for vehicle repair. I need to set a time line to track initial work, when to order parts, when to schedule the work etc. Basically I want column A to be the start or work request , all the way to column J to be the start of work. In between will be target dates. So A will be lets say 180 days from J. And in between A-J will be other target dates that are critical to planning of the work and ordering parts. |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Tracking Changes | Excel Worksheet Functions | |||
How to insert tracking numbers into my webpage for RMA tracking | Excel Discussion (Misc queries) | |||
Create patient schedule based on master therapist schedule | Excel Discussion (Misc queries) | |||
Employee Tracking Schedule | Excel Discussion (Misc queries) | |||
tracking | Excel Discussion (Misc queries) |