Home |
Search |
Today's Posts |
#1
![]()
Posted to microsoft.public.excel.programming
|
|||
|
|||
![]()
I want to put a button on a sheet that (a) executes the inbuilt procedure for
drawing a curved line (as on toolbar drawing - autoshapes - line - curve) (b) let the user defire the points for the curve and when finished (c) have the code format the line. I have the code calling the function but I don't know how to tell the procedure to stop and wait for the user to finish drawing the curve before it runs the formatting code. Any ideas how I trap this event? -- Oxfordshire, UK |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
change color of curve line as time changes | Charts and Charting in Excel | |||
Error bars, curve/line of best fit, axis help | Charts and Charting in Excel | |||
What makes a polynomial trend line curve up or down? | Charts and Charting in Excel | |||
Trend Line - Bell Curve | Excel Discussion (Misc queries) | |||
Plot the sin curve along the line y=x | Charts and Charting in Excel |