Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1   Report Post  
Posted to microsoft.public.excel.programming
external usenet poster
 
Posts: 2
Default excel graph construction

What is the formula for constructing a graph that has a known starting
position; then has a speed formula that caculates number of feet moved in x
seconds to a new location on the graph. Example: start position A, moves 350
feet, and ends at position D.
Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
How do I build a Construction Schedule of Values in Excel? Caleb Howze Excel Worksheet Functions 1 December 8th 06 11:39 PM
How do I create a graph that depicts construction progress? Tom Verdel Charts and Charting in Excel 1 December 23rd 05 03:26 AM
Need help with List Box setup construction in Excel caldog Excel Programming 1 August 24th 05 06:36 AM
How do I manage a residential construction project with Excel? rustic New Users to Excel 1 May 3rd 05 02:50 PM
Using Excel in construction drawing incjourn[_5_] Excel Programming 0 September 16th 04 09:37 AM


All times are GMT +1. The time now is 04:47 PM.

Powered by vBulletin® Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 ExcelBanter.
The comments are property of their posters.
 

About Us

"It's about Microsoft Excel"