Default Importing data from MS Project

I have developed VBA classes under an Excel 2000 workbook that import
data from MS Project 98. These currently iterate through each task in
the project and writes the task information to cells in the workbook.
The plans are several thousands task long and so the import process is
quite slow. Is there a quicker way of doing this (like DAO?).

One constraint that I have is that other users need to be able to use
their own copies of the workbook and these people may be using Excel 97
or 2000 and MS Project 98 or 2000 or combinations thereof.

Thanks in anticipation.

Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Importing Alan Beban's code on Arrays; Importing a module or a project Steve G Excel Worksheet Functions 4 August 27th 07 04:18 PM
With VBA from Excel: Open Project, extract resource list and copy it to a worksheet, close project. Tony Excel Programming 1 October 18th 05 03:53 PM
Assigning the Help 4, *.HLP file for a project programmatically in a protected Project Tony Seiscons Excel Programming 0 October 4th 04 03:10 PM
Accesing vba project from wb that has vba project password protected cassidyr1 Excel Programming 2 July 3rd 04 01:49 PM
Importing from MS Project -- problems with commas Martin[_8_] Excel Programming 1 September 12th 03 07:28 AM


All times are GMT +1. The time now is 08:54 PM.

Powered by vBulletin® Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 ExcelBanter.
The comments are property of their posters.
 

About Us

"It's about Microsoft Excel"