Home |
Search |
Today's Posts |
#1
![]()
Posted to microsoft.public.excel.programming
|
|||
|
|||
![]()
I'm currently transferring a project to my US office, and I have some
concerns over the calendar I am using. The reference is known as 'calendar control 10', and currently it doesn't work in line with the system setting i.e I have changed my system setting to U.S but for some reason the calendar displays 3/2/2006 as 3 Feb 2006, yet displays 3/30/2006 as 30 March 2006 (correct). Firstly can this is be fixed? It it can't, I can alter the date manually but if I do this, when the spreadsheet is transferred over, how will the calender control behave in the US version of Excel? Any help appreciated |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Calendar control | Excel Discussion (Misc queries) | |||
Control disappeared problem - specifically, the Calendar Control | Excel Programming | |||
Calendar Control | Excel Programming | |||
Calendar Control: Can't exit design mode because control can't be created | Excel Programming | |||
Calendar Control | Excel Programming |