LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #1   Report Post  
Posted to microsoft.public.excel.programming
jer jer is offline
external usenet poster
 
Posts: 25
Default scheduling dates

dear all
I have a worksheet with a comlum of dates
is there a way to increment the dates using code
for example

existing results
column column (e.g. after adding 6 months)

10/15/05 04/15/06
10/15/05 04/15/06
10/16/05 04/16/06

I know I can acheive this with the formula
=DATE(YEAR(A1),MONTH(A1)+6,DAY(A1))
but is there a simple way to do this with code

--
thanks as always for the help
jer
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Scheduling Matt Excel Discussion (Misc queries) 0 May 16th 10 02:17 AM
Scheduling... Maxime Maugeais Excel Discussion (Misc queries) 3 June 20th 07 05:21 AM
Calculating dates - complex scheduling problem jct Excel Worksheet Functions 1 February 22nd 06 08:01 PM
Scheduling employees by dates... LOOKUP or FILTER? ssleene Excel Worksheet Functions 0 November 14th 05 06:58 PM
Scheduling Adam R via OfficeKB.com Excel Discussion (Misc queries) 1 July 15th 05 10:30 PM


All times are GMT +1. The time now is 12:38 AM.

Powered by vBulletin® Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 ExcelBanter.
The comments are property of their posters.
 

About Us

"It's about Microsoft Excel"