LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #1   Report Post  
Posted to microsoft.public.excel.programming
pgc pgc is offline
external usenet poster
 
Posts: 11
Default time line

hi i need a time line to be generated from a start finish date
start date finish date
24/5/05 26/6/05
i need the time on three rows the first showing the month the second
showing the date and the third showing the day as the next illustration

May June
24 25 26 27 28 29 30 31 1 2 3
mon tue wed thur fri
first off is it possible in excell
second if so how do you do it
third if not is there something that will work
all replies will be most gratefull
cheers

 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Highlight every other line at one time Smreifeis Excel Discussion (Misc queries) 3 February 10th 09 12:05 AM
Time Line Graph TenoreBSH Charts and Charting in Excel 1 May 20th 08 08:46 PM
time in subject line jatman Excel Discussion (Misc queries) 1 April 20th 08 07:29 AM
line chart over time [email protected] Charts and Charting in Excel 3 September 5th 06 03:12 AM
TIME LINE? ConfusedNHouston Excel Discussion (Misc queries) 1 July 21st 05 11:49 PM


All times are GMT +1. The time now is 11:16 AM.

Powered by vBulletin® Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 ExcelBanter.
The comments are property of their posters.
 

About Us

"It's about Microsoft Excel"