LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #1   Report Post  
Posted to microsoft.public.excel.programming
external usenet poster
 
Posts: 71
Default calendar control

Hi Everybody,

some time ago i created a spreadsheet with a button which, when clicked,
opened a built-in calendar (which the user could then navigate, click on a
date and it completed a cell on the sheet). since our work pc's have been
upgraded (XP Pro, Excel 2002) it no longer works on my colleagues pc (he has
been given a whole new pc).

so my question is: what haven't i installed on his pc to get it to work? i
was pretty sure i had to install/activate a calendar control via the VB
editor, but couldn't find it. A screen grab is available at
http://uk.pg.photos.yahoo.com/ph/tma...&.dnm=36e5.jpg

i'm guessing if there is a specific file i can just copy it from my
installation (but i don't understand why its not there already)

thanks,

tim


 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Calendar control D. Excel Discussion (Misc queries) 0 July 3rd 07 11:19 PM
Calendar Control Vern Rabe Excel Programming 1 May 24th 04 06:15 PM
Calendar Control: Can't exit design mode because control can't be created Rone Excel Programming 0 May 24th 04 04:01 PM
VBA Calendar control Jackie[_3_] Excel Programming 0 February 13th 04 06:00 PM
calendar control Asif[_3_] Excel Programming 8 November 30th 03 05:48 PM


All times are GMT +1. The time now is 06:39 AM.

Powered by vBulletin® Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 ExcelBanter.
The comments are property of their posters.
 

About Us

"It's about Microsoft Excel"