Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1   Report Post  
Posted to microsoft.public.excel.misc
eomkydnar
 
Posts: n/a
Default I need a program to set up construction schedules.

I am a home builder. I would like to find a program that would allow me to
create a spread sheet of sorts with a timeline and subcontractor tasks. Some
type of construction schedule that I could enlarge and share with all the
trades and keep one at the jobsite.
Thanks
  #2   Report Post  
Posted to microsoft.public.excel.misc
pinmaster
 
Posts: n/a
Default I need a program to set up construction schedules.


Check these out

http://www.comprotexsoftware.com/lumber.htm
http://construction.intuit.com/
http://www.turtlesoft.com/homebldr.html

you can probably find more by doing a search on Google.com

HTH
JG


--
pinmaster
------------------------------------------------------------------------
pinmaster's Profile: http://www.excelforum.com/member.php...fo&userid=6261
View this thread: http://www.excelforum.com/showthread...hreadid=496662

Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Need Help Initializing Excel Spreadsheet Program jb999 Excel Discussion (Misc queries) 0 November 7th 05 05:57 PM
Need Help Initializing Excel Spreadsheet Program jb999 Excel Discussion (Misc queries) 3 November 2nd 05 11:09 PM
How to display a form- to show status of the running program Joseph Excel Discussion (Misc queries) 2 May 31st 05 11:31 AM
Hyperlink in Excel opens the right program, but can't read file. Katydid Excel Discussion (Misc queries) 0 May 6th 05 04:16 PM
Charts causing program to crash Fysh Charts and Charting in Excel 1 December 16th 04 10:12 PM


All times are GMT +1. The time now is 09:33 AM.

Powered by vBulletin® Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 ExcelBanter.
The comments are property of their posters.
 

About Us

"It's about Microsoft Excel"