Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1   Report Post  
Ron Rosenfeld
 
Posts: n/a
Default Calculation with Working day of the year

On 10 Nov 2005 08:27:34 -0800, "Box666" wrote:

Ron,
Thank you spot on, I do not seem to have the logical thinking to
work these things backwards.. but when I see the answer i realise how
"obvious" it is.

Thanks

Bob


You're welcome. Glad to help. Sometimes it's interesting to find a function
that I did not know existed.


--ron
Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Automatic calculation is not working susang Excel Discussion (Misc queries) 4 November 4th 05 03:51 PM
Commission Calculation nospaminlich Excel Worksheet Functions 8 November 1st 05 02:47 PM
Working days left in the month compared to previous months qwopzxnm Excel Worksheet Functions 8 October 24th 05 08:00 PM
Is the IRR calculation based on cash flows at beginning of year? sammad Excel Worksheet Functions 1 September 6th 05 05:15 PM
Calculation Setting in Excel Stuart Bisset Excel Discussion (Misc queries) 0 June 17th 05 09:54 AM


All times are GMT +1. The time now is 07:39 PM.

Powered by vBulletin® Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 ExcelBanter.
The comments are property of their posters.
 

About Us

"It's about Microsoft Excel"