Donna Silva
 
Posts: n/a
Default Automatic Changes to Linked Cells

I eed to find a way to link to a cell and have the link follow that cell
should it chanage due to editing of the spreadsheet. For example in
Spreadsheet 1 I linked cell A1 to cell B1 in spreadsheet 2. Then I made
changes in spreadsheet 2 and the contents of cell B1 are now located in cell
B5. How do I get the link in spreadsheet 1 cell A1 to automatically change
to be linked to cell B5 in spreadsheet 2?

The version of excel that I have automatically puts in the "$" before the
cell letter and number. I have done a test by taking out the "$" to see if
it would follow the original cell and it does not.
Any ideas?
--
Donna Silva
Finance Director
City of Rio Vista
  #2   Report Post  
bigwheel
 
Posts: n/a
Default

What formula do you have in cell A1 on sheet 1? I've put =Sheet2!B1 and if I
insert columns in Sheet 2 the formula changes to =Sheet2!F1

Is that what you need?

"Donna Silva" wrote:

I eed to find a way to link to a cell and have the link follow that cell
should it chanage due to editing of the spreadsheet. For example in
Spreadsheet 1 I linked cell A1 to cell B1 in spreadsheet 2. Then I made
changes in spreadsheet 2 and the contents of cell B1 are now located in cell
B5. How do I get the link in spreadsheet 1 cell A1 to automatically change
to be linked to cell B5 in spreadsheet 2?

The version of excel that I have automatically puts in the "$" before the
cell letter and number. I have done a test by taking out the "$" to see if
it would follow the original cell and it does not.
Any ideas?
--
Donna Silva
Finance Director
City of Rio Vista

  #3   Report Post  
Donna Silva
 
Posts: n/a
Default

As long as I keep both files open while I am modifying the spreadsheet to
which it is linked, then any changes are updated and the cell is tracked.
However, if I make changes in the spreadsheet to which I linked, without
having the other spreadsheet open, it does not follow the changes when I open
up the one that contains the link.
--
Donna Silva
Finance Director
City of Rio Vista


"bigwheel" wrote:

What formula do you have in cell A1 on sheet 1? I've put =Sheet2!B1 and if I
insert columns in Sheet 2 the formula changes to =Sheet2!F1

Is that what you need?

"Donna Silva" wrote:

I eed to find a way to link to a cell and have the link follow that cell
should it chanage due to editing of the spreadsheet. For example in
Spreadsheet 1 I linked cell A1 to cell B1 in spreadsheet 2. Then I made
changes in spreadsheet 2 and the contents of cell B1 are now located in cell
B5. How do I get the link in spreadsheet 1 cell A1 to automatically change
to be linked to cell B5 in spreadsheet 2?

The version of excel that I have automatically puts in the "$" before the
cell letter and number. I have done a test by taking out the "$" to see if
it would follow the original cell and it does not.
Any ideas?
--
Donna Silva
Finance Director
City of Rio Vista

  #4   Report Post  
Earl Kiosterud
 
Posts: n/a
Default

Donna,

That's your answer. You must keep the workbook containing the link open
when the linked cell is moved. Otherwise, the link has no way of knowing
the cell was moved while it was asleep. This is just part of managing
linked files.

--
Earl Kiosterud
www.smokeylake.com/
-------------------------------------------

"Donna Silva" wrote in message
...
As long as I keep both files open while I am modifying the spreadsheet to
which it is linked, then any changes are updated and the cell is tracked.
However, if I make changes in the spreadsheet to which I linked, without
having the other spreadsheet open, it does not follow the changes when I
open
up the one that contains the link.
--
Donna Silva
Finance Director
City of Rio Vista


"bigwheel" wrote:

What formula do you have in cell A1 on sheet 1? I've put =Sheet2!B1 and
if I
insert columns in Sheet 2 the formula changes to =Sheet2!F1

Is that what you need?

"Donna Silva" wrote:

I eed to find a way to link to a cell and have the link follow that
cell
should it chanage due to editing of the spreadsheet. For example in
Spreadsheet 1 I linked cell A1 to cell B1 in spreadsheet 2. Then I
made
changes in spreadsheet 2 and the contents of cell B1 are now located in
cell
B5. How do I get the link in spreadsheet 1 cell A1 to automatically
change
to be linked to cell B5 in spreadsheet 2?

The version of excel that I have automatically puts in the "$" before
the
cell letter and number. I have done a test by taking out the "$" to
see if
it would follow the original cell and it does not.
Any ideas?
--
Donna Silva
Finance Director
City of Rio Vista



Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
embedding worksheet cells in another worksheet SCW Excel Discussion (Misc queries) 2 April 25th 05 04:29 PM
Preserving hyperlinks in linked cells JulieW Excel Discussion (Misc queries) 1 February 24th 05 07:53 PM
automatic color change in cells using a drop down list kennethwt Excel Worksheet Functions 1 January 21st 05 06:37 PM
Help adding text values Texas-DC_271 Excel Worksheet Functions 7 January 15th 05 11:14 PM
inserting row into linked cells Laurel Excel Worksheet Functions 2 December 14th 04 05:47 PM


All times are GMT +1. The time now is 04:47 PM.

Powered by vBulletin® Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 ExcelBanter.
The comments are property of their posters.
 

About Us

"It's about Microsoft Excel"