I have a spreadsheet that list a planned completion date and then has an
actual completion date. I have a formula that places a Y or N depending if
production met the contractual due out date or not. What I want to do is
calculate my % effective based on the "Yes" and "No" criteria. Is there a
way?
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Formula question Jeffrey Excel Discussion (Misc queries) 2 July 1st 05 06:57 PM
One formula on multiple workbooks question Josh M Excel Discussion (Misc queries) 1 May 24th 05 03:17 AM
time formula question... Greg Excel Discussion (Misc queries) 5 February 25th 05 10:11 AM
Match / Vlookup within an Array formula Hari Prasadh Excel Discussion (Misc queries) 3 February 3rd 05 04:37 PM
formula Question danlinksman Excel Discussion (Misc queries) 3 January 25th 05 02:07 PM


All times are GMT +1. The time now is 05:52 PM.

Powered by vBulletin® Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 ExcelBanter.
The comments are property of their posters.
 

About Us

"It's about Microsoft Excel"