LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #1   Report Post  
Gabriele
 
Posts: n/a
Default project values based on other values

How can I project the values for November and December if I have values for
January - October? What is the correct formula?
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Zero values in a log chart Joelle_Smith Charts and Charting in Excel 2 May 8th 23 03:42 AM
Second serie doesn't use X-as values JackRnl Charts and Charting in Excel 1 January 20th 05 01:04 AM
Missing values in Excel Line Chart mw55309 Charts and Charting in Excel 1 January 19th 05 12:10 PM
Selecting data from a list based on entered values GrantM Excel Discussion (Misc queries) 1 December 20th 04 10:59 AM
HOW TO: Plot a Team Name on a chart based on two values Kevin McCartney Charts and Charting in Excel 1 November 30th 04 05:26 PM


All times are GMT +1. The time now is 01:18 PM.

Powered by vBulletin® Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 ExcelBanter.
The comments are property of their posters.
 

About Us

"It's about Microsoft Excel"