LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #1   Report Post  
natvsi
 
Posts: n/a
Default Calculate elasped time

I need a formula that will calulate the amount of elapsed time.
I'm tracking the amount of time the project took from one department to the
next.
For example...
Job 1234 went in department A on 4/22/05 at 3:30 p.m. and left the
department on 4/25/05 at noon. We work eight hour days (8am to 5pm) so the
project was in department A for 5.5 hours.
How do I subtract out the non-working hours? I've tried the networkdays and
holidays functions, but they don't work.
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Calculate time difference to the half hour Ken Ivins Excel Worksheet Functions 6 July 17th 05 05:48 PM
Calculate time Rao Ratan Singh Excel Discussion (Misc queries) 2 March 17th 05 02:28 PM
How do I calculate charges based on elasped time(H:MM) & rate($)? glass-artist-web-developer Excel Discussion (Misc queries) 1 March 12th 05 02:09 AM
calculate difference in time to hours Chris Excel Worksheet Functions 5 January 18th 05 06:07 PM
calculate negative or positve difference in time kpmoore Excel Discussion (Misc queries) 2 January 5th 05 01:35 AM


All times are GMT +1. The time now is 03:37 PM.

Powered by vBulletin® Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 ExcelBanter.
The comments are property of their posters.
 

About Us

"It's about Microsoft Excel"