Default Critical graph

Anyone know the best way to show a critical graph in office?

i.e. where you have dates in a top column, and down the side jobs to
do. It is usually expressed as blocks against each item to do and
covering the relevant weeks concerned in a dark line or block.

I'm guessing Excel would be the best tool for this but maybe not...

Thanks in advance,
Jen

  #2   Report Post  
Posted to microsoft.public.excel.misc
external usenet poster
 
Posts: 4
Default Critical graph

Have you tried the Excel templates you can download from Microsoft? There may
be something you are look for there.
--
Bozo


"derdle" wrote:

Anyone know the best way to show a critical graph in office?

i.e. where you have dates in a top column, and down the side jobs to
do. It is usually expressed as blocks against each item to do and
covering the relevant weeks concerned in a dark line or block.

I'm guessing Excel would be the best tool for this but maybe not...

Thanks in advance,
Jen


  #3   Report Post  
Posted to microsoft.public.excel.misc
external usenet poster
 
Posts: 13
Default Critical graph

I think Microsoft Project is the package you are looking for.

"derdle" wrote:

Anyone know the best way to show a critical graph in office?

i.e. where you have dates in a top column, and down the side jobs to
do. It is usually expressed as blocks against each item to do and
covering the relevant weeks concerned in a dark line or block.

I'm guessing Excel would be the best tool for this but maybe not...

Thanks in advance,
Jen


  #4   Report Post  
Posted to microsoft.public.excel.misc
external usenet poster
 
Posts: 762
Default Critical graph

Search groups.google.com for "excel gantt chart" (without the quotes) and
you'll find dozens of ways to create it.

- Mike
http://www.mikemiddleton.com

"luvthavodka" wrote in message
...
I think Microsoft Project is the package you are looking for.

"derdle" wrote:

Anyone know the best way to show a critical graph in office?

i.e. where you have dates in a top column, and down the side jobs to
do. It is usually expressed as blocks against each item to do and
covering the relevant weeks concerned in a dark line or block.

I'm guessing Excel would be the best tool for this but maybe not...

Thanks in advance,
Jen




Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Out of range line disappears in print as it re-enters graph Nisse PowerMan Charts and Charting in Excel 2 October 31st 06 11:32 AM
Combination Line and Bar Graph M Moore Charts and Charting in Excel 1 September 1st 06 09:13 AM
Bar graph and line graph overlayed MikeR-Oz Charts and Charting in Excel 4 February 6th 06 07:01 AM
Dynamic Range with unused formula messing up x axis on dynamic graph [email protected] Charts and Charting in Excel 2 February 2nd 06 08:02 PM
Hyperlinkage of one graph with another graph or Drill down graph Sanjay Kumar Singh Charts and Charting in Excel 1 January 3rd 06 12:22 PM


All times are GMT +1. The time now is 07:14 AM.

Powered by vBulletin® Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 ExcelBanter.
The comments are property of their posters.
 

About Us

"It's about Microsoft Excel"