Hi,

I need your help. I am facing a very different issue.

Last month I prepared a report where I had to calculate the no. of days
between 2 dates.

For Instance :

Date when call made Date when call tracker updated
8/13/06 8/17/06

Since I wanted only working days to be calculated I used Network days for
calculation purpose
=NETWORKDAYS(F10,I10,Registration!$AE$45044:$AE$45 055)-1
Wherein the list range is for holidays.

I have placed this file on a shared location and earlier when anybody
accessed this file he used to get "NAME?" in the network days formula cell.
This used to get rectified when I use to open the file, but today when I
updated a few details I am getting "NAME?" in the formula cell.


PLEASE HELP.... as this is a very important report which I have prepared.

Thanks,
Dinesh

--
Message posted via OfficeKB.com
http://www.officekb.com/Uwe/Forums.a...excel/200607/1
  #2   Report Post  
Posted to microsoft.public.excel.misc
external usenet poster
 
Posts: 2,886
Default Network Days

Hi

Networkdays requires the Analysis Toolpak to be loaded
ToolsAddins check Analysis Toolpak

--
Regards

Roger Govier


"dinadvani via OfficeKB.com" <u22798@uwe wrote in message
news:6391fdcabb5c7@uwe...
Hi,

I need your help. I am facing a very different issue.

Last month I prepared a report where I had to calculate the no. of
days
between 2 dates.

For Instance :

Date when call made Date when call tracker
updated
8/13/06 8/17/06

Since I wanted only working days to be calculated I used Network days
for
calculation purpose
=NETWORKDAYS(F10,I10,Registration!$AE$45044:$AE$45 055)-1
Wherein the list range is for holidays.

I have placed this file on a shared location and earlier when anybody
accessed this file he used to get "NAME?" in the network days formula
cell.
This used to get rectified when I use to open the file, but today when
I
updated a few details I am getting "NAME?" in the formula cell.


PLEASE HELP.... as this is a very important report which I have
prepared.

Thanks,
Dinesh

--
Message posted via OfficeKB.com
http://www.officekb.com/Uwe/Forums.a...excel/200607/1



  #3   Report Post  
Posted to microsoft.public.excel.misc
external usenet poster
 
Posts: 11,123
Default Network Days


Hi dinadvani

NETWORKDAYS is a ATP function

Do you have the add-in installed ?
ToolsAddins

From Help:
If this function is not available, and returns the #NAME? error, install and load the Analysis ToolPak add-in.




--
Regards Ron de Bruin
http://www.rondebruin.nl



"dinadvani via OfficeKB.com" <u22798@uwe wrote in message news:6391fdcabb5c7@uwe...
Hi,

I need your help. I am facing a very different issue.

Last month I prepared a report where I had to calculate the no. of days
between 2 dates.

For Instance :

Date when call made Date when call tracker updated
8/13/06 8/17/06

Since I wanted only working days to be calculated I used Network days for
calculation purpose
=NETWORKDAYS(F10,I10,Registration!$AE$45044:$AE$45 055)-1
Wherein the list range is for holidays.

I have placed this file on a shared location and earlier when anybody
accessed this file he used to get "NAME?" in the network days formula cell.
This used to get rectified when I use to open the file, but today when I
updated a few details I am getting "NAME?" in the formula cell.


PLEASE HELP.... as this is a very important report which I have prepared.

Thanks,
Dinesh

--
Message posted via OfficeKB.com
http://www.officekb.com/Uwe/Forums.a...excel/200607/1



  #4   Report Post  
Posted to microsoft.public.excel.misc
external usenet poster
 
Posts: 19
Default Network Days

Thanks a lot for your help



Roger Govier wrote:
Hi

Networkdays requires the Analysis Toolpak to be loaded
ToolsAddins check Analysis Toolpak

Hi,

[quoted text clipped - 28 lines]
Thanks,
Dinesh


--
Message posted via OfficeKB.com
http://www.officekb.com/Uwe/Forums.a...excel/200607/1
Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Network days question Annette Excel Worksheet Functions 2 June 29th 06 04:18 PM
No. of days split into periods Brian Ferris Excel Discussion (Misc queries) 3 January 31st 06 03:29 PM
Calendar Days and Option Buttons Andy Excel Discussion (Misc queries) 0 January 10th 06 09:50 PM
30, 60, 90 days late and due within 14 days armyaviatr Excel Discussion (Misc queries) 1 November 7th 05 09:14 AM
Working days left in the month compared to previous months qwopzxnm Excel Worksheet Functions 8 October 24th 05 08:00 PM


All times are GMT +1. The time now is 12:46 PM.

Powered by vBulletin® Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 ExcelBanter.
The comments are property of their posters.
 

About Us

"It's about Microsoft Excel"