LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #1   Report Post  
Posted to microsoft.public.excel.charting
external usenet poster
 
Posts: 1
Default Date Axis Must be on Date Basis

I am graphing my son's date-weight graphic. But our weighting dates are
irregular. When I graph those datas, between dates in x-axis become equal.
But I want excel understand they are dates and scale like dates. For example
2 days between two date is same space as 2 months. I want two months must
have 30 times of two days space. How can I graph more realistic dates...
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
count between start date and end date flow23 Excel Discussion (Misc queries) 5 May 10th 06 01:22 PM
Determining Date X based on Other dates MIchel Khennafi Excel Worksheet Functions 1 May 3rd 06 04:45 PM
Formula for determining if two date columns fall within specific date range Igottabeme Excel Worksheet Functions 2 April 21st 06 02:50 AM
Formula for determining if two date columns fall within specific date range Igottabeme Excel Discussion (Misc queries) 1 April 20th 06 10:03 PM
how to show date on the x axis of a line chart? Ginger Charts and Charting in Excel 4 May 1st 05 02:11 AM


All times are GMT +1. The time now is 08:56 AM.

Powered by vBulletin® Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 ExcelBanter.
The comments are property of their posters.
 

About Us

"It's about Microsoft Excel"