Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1   Report Post  
Posted to microsoft.public.excel.charting
external usenet poster
 
Posts: 2
Default Making a graph with easily changed dates

My boss asked me to make a graph on one of his spreadsheets more user
friendly...so that you could put a start and end date in two ajacent cells
and the graph will automatically change to show the time between those dates.
I didn't think it was going to be too hard but now i'm completely
stumped...I've got the dates on the X-axis and 3 other lines that come from
data on another sheet...and i can't even get the X-axis to easily adjust to
two changeable dates (it will just show those two days rather than all the
days inbetween).....if anyone has any suggestions i'd greatly appreciate it.
thanks!
  #2   Report Post  
Posted to microsoft.public.excel.charting
external usenet poster
 
Posts: 915
Default Making a graph with easily changed dates

Sean123 wrote:
My boss asked me to make a graph on one of his spreadsheets more user
friendly...so that you could put a start and end date in two ajacent cells
and the graph will automatically change to show the time between those dates.
I didn't think it was going to be too hard but now i'm completely
stumped...I've got the dates on the X-axis and 3 other lines that come from
data on another sheet...and i can't even get the X-axis to easily adjust to
two changeable dates (it will just show those two days rather than all the
days inbetween).....if anyone has any suggestions i'd greatly appreciate it.
thanks!


Hi Sean123,

First google "excel chart dynamic ranges".

If you aren't familiar with named ranges and OFFSET (and probably INDEX
and MATCH) be prepared to spend some time getting familiar with the tool
set.

I very briefly previewed a few google results and can tell you these
look like good places to start your research. Sure there are others as well.

http://www.contextures.com/xlNames02.html
http://office.microsoft.com/en-us/ex...098011033.aspx
http://www.ozgrid.com/Excel/ChartTips.htm

Once you have the technique down you can /really/ wow the boss by
placing dynamic controls on the chart itself.

I'm all about wowing the boss. Please post back if you get stuck!
  #3   Report Post  
Posted to microsoft.public.excel.charting
external usenet poster
 
Posts: 2
Default Making a graph with easily changed dates

smartin,
Thanks for the reply...those links were really helpful! I think i've almost
got it figured out with one last hangup....I've got it so it will plot all
the appropriate data inbetween the dates, but I can't get the actual scale of
the x-axis to change as i change the start/finish data.... I've been checking
out those sources and haven't found anything, if you think you know a way
that'd be awesome....otherwise, for now i could just put a note below the
input dates instructing to change the scale of the x-axis accordingly

Thanks, hope you have a great weekend!

Sean

"smartin" wrote:

Sean123 wrote:
My boss asked me to make a graph on one of his spreadsheets more user
friendly...so that you could put a start and end date in two ajacent cells
and the graph will automatically change to show the time between those dates.
I didn't think it was going to be too hard but now i'm completely
stumped...I've got the dates on the X-axis and 3 other lines that come from
data on another sheet...and i can't even get the X-axis to easily adjust to
two changeable dates (it will just show those two days rather than all the
days inbetween).....if anyone has any suggestions i'd greatly appreciate it.
thanks!


Hi Sean123,

First google "excel chart dynamic ranges".

If you aren't familiar with named ranges and OFFSET (and probably INDEX
and MATCH) be prepared to spend some time getting familiar with the tool
set.

I very briefly previewed a few google results and can tell you these
look like good places to start your research. Sure there are others as well.

http://www.contextures.com/xlNames02.html
http://office.microsoft.com/en-us/ex...098011033.aspx
http://www.ozgrid.com/Excel/ChartTips.htm

Once you have the technique down you can /really/ wow the boss by
placing dynamic controls on the chart itself.

I'm all about wowing the boss. Please post back if you get stuck!

  #4   Report Post  
Posted to microsoft.public.excel.charting
external usenet poster
 
Posts: 6,582
Default Making a graph with easily changed dates

I think this link would have been the best place to start:

Dynamic Charting By Dates
http://pubs.logicalexpressions.com/P...cle.asp?ID=246

- Jon
-------
Jon Peltier, Peltier Technical Services, Inc.
http://PeltierTech.com/WordPress/

Advanced Excel Conference - June 17-18 2009 - Charting and Programming
http://peltiertech.com/Training/2009...00906ACNJ.html
_______


"Sean123" wrote in message
...
smartin,
Thanks for the reply...those links were really helpful! I think i've
almost
got it figured out with one last hangup....I've got it so it will plot all
the appropriate data inbetween the dates, but I can't get the actual scale
of
the x-axis to change as i change the start/finish data.... I've been
checking
out those sources and haven't found anything, if you think you know a way
that'd be awesome....otherwise, for now i could just put a note below the
input dates instructing to change the scale of the x-axis accordingly

Thanks, hope you have a great weekend!

Sean

"smartin" wrote:

Sean123 wrote:
My boss asked me to make a graph on one of his spreadsheets more user
friendly...so that you could put a start and end date in two ajacent
cells
and the graph will automatically change to show the time between those
dates.
I didn't think it was going to be too hard but now i'm completely
stumped...I've got the dates on the X-axis and 3 other lines that come
from
data on another sheet...and i can't even get the X-axis to easily
adjust to
two changeable dates (it will just show those two days rather than all
the
days inbetween).....if anyone has any suggestions i'd greatly
appreciate it.
thanks!


Hi Sean123,

First google "excel chart dynamic ranges".

If you aren't familiar with named ranges and OFFSET (and probably INDEX
and MATCH) be prepared to spend some time getting familiar with the tool
set.

I very briefly previewed a few google results and can tell you these
look like good places to start your research. Sure there are others as
well.

http://www.contextures.com/xlNames02.html
http://office.microsoft.com/en-us/ex...098011033.aspx
http://www.ozgrid.com/Excel/ChartTips.htm

Once you have the technique down you can /really/ wow the boss by
placing dynamic controls on the chart itself.

I'm all about wowing the boss. Please post back if you get stuck!



Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Help with making a graph Andrea Charts and Charting in Excel 1 January 27th 09 04:43 PM
graph changed from the last time I worked with it jake 750 Charts and Charting in Excel 1 May 25th 08 06:19 PM
graph won't update when data is changed Larry F Charts and Charting in Excel 0 May 11th 07 07:16 AM
Making a Graph Buggy Excel Discussion (Misc queries) 3 July 14th 06 08:31 PM
Cross worksheet references cannot be easily changed maintchief Excel Discussion (Misc queries) 0 November 26th 05 03:32 AM


All times are GMT +1. The time now is 01:27 AM.

Powered by vBulletin® Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 ExcelBanter.
The comments are property of their posters.
 

About Us

"It's about Microsoft Excel"