View Single Post
  #2   Report Post  
Peo Sjoblom
 
Posts: n/a
Default

=total_time*24*rate formatted as number or currency


Regards,

Peo Sjoblom

"Keith" wrote:

If in column A I have the time a job started and in column B the time a job
ended and I find the time elapsed in column C. From column D I have entered
a fixed rate. I want excel to calculate the amount due in column E. How do
I do this?