=total_time*24*rate formatted as number or currency
Regards,
Peo Sjoblom
"Keith" wrote:
If in column A I have the time a job started and in column B the time a job
ended and I find the time elapsed in column C. From column D I have entered
a fixed rate. I want excel to calculate the amount due in column E. How do
I do this?
|