Hi Sony

Perhaps your values in column B are not numbers but text which looks
like numbers.
Try amending the formula to
=SUMPRODUCT(--(Sheet1!$A$2:$A$1000<=B1),--(Sheet1!$B$2:$B$1000))


--
Regards

Roger Govier


"sony654" wrote in message
...
Roger - When I follow the instructions below it returns the value of
"0" in
Sheet 2, A1 thru A3. Please advise. I'm sure I'm doing something
wrong.
Pleae advise if I need to tweak the formulas. Thanks for your help -
Sony
--
Sony Luvy


"Roger Govier" wrote:


wrote
Sorry... The text on first post shifted and looks like ****.
First of all
let me wish a happy new year to the group. I appreciate
everything
the group
has done to help... and it has. Her is my recent function
dilema.
I'll illustrate below. I want to be able to shift a calulated
value based on the date it was entered.
I want to be able to post the results by date and have each
result
maintained in the database. Thanks for your insight. I know
this
should be
possible.
10/22 10/23 10/24 A1 formula result
14.00 14.50 14.25 A2 formula result Results by
date
A3 formula result 10/22
10/23 10/24
----------------
TOTAL: (a1..a3) 71.05 69.00 72.34
71.05**
The above TOTAL ** The above is based
on changes each date in the calculated
TOTAL
- Sony Luvy


Hi

Maybe you should hold your data a different way.
Suppose on Sheet1 in column A you had Dates, with a heading in A1 of
Date, and in column B the values, with a heading in B1 of Value.

On sheet2, in cell B1 enter =TODAY(), in B2 =TODAY()-1, in B3
=TODAY()-3
On sheet2 in cell A1 enter
=SUMPRODUCT(--(Sheet1!$A$2:$A$1000<=B1),Sheet1!$B$2:$B$1000)
copy the formula down through cells A2:A3

Now cells A1 to A3 will represent the cumultaive values up to the
given
dates, in my example, the last 3 dates.
Change the value in B1 to wahtever you want, and B2 and B3 will
change
to reflect the preceding 2 days.

Does this achievewaht you are after?

--
Regards

Roger Govier



sony654 wrote:
Barb - Your right. My post is difficult to explain. Below you
will
see that values are entered in to the worksheet on 10/22, 10/23 and
10/24. As the entered values each day impact the calculation of
A1..A3, the sum of A1..A3 updates based on the most rercent value
entered (14.25 on 10/24). As the result calculates each day, I'd
like to be able to "save" the calculated value by date and post it
to
the right of the A1..A3 TOTAL. Is there a way to reference the
value
by the date it was calculated?
For example, when the value for 10/24 is entered, I don't want the
calculations for 10/22 and 10/23 to go away. Shift isn't a good
explanation. I want to be able to trend the daily values of the
calculation A1..A3. Thanks for your patience, and for giving this a
second look.

--
Sony Luvy


"Barb Reinhardt" wrote:

You probably aren't getting replies because it's not clear what
you
want. Can you show us what you have and are trying to "shift".
The
whole SHIFT issue isn't clear to me at all.

"sony654" wrote in message