Thread: Every 28 days
View Single Post
  #5   Report Post  
Steved
 
Posts: n/a
Default

Yes thanks Bob

"Bob Phillips" wrote:

Because it is exactly 28 days later perhaps?

--
HTH

Bob Phillips

"Steved" wrote in message
...
Hello Bob from Steved

Thanks 1 situation is that it has done the 28 days as instructed
but it has highlihted a row above with this formula in it
=DATE(YEAR(L3),MONTH(L3)+1,DAY(L3))

I not to concerned but just curious as to why

Thankyou.

"Bob Phillips" wrote:

Conditional formatting, with a formula of

=MOD(A2-DATE(2005,2,4),28)=0

--
HTH

Bob Phillips

"Steved" wrote in message
...
Hello from Steved
Is this possible please.

Feb the 4th then every calendar days colour the cell red so in this
instance
March the 4th being the 28th day the cell will change to a red

background.

Thankyou.