View Single Post
  #1   Report Post  
Phyllis Salyers
 
Posts: n/a
Default combine date from one column with time from another

I would like to combine the date from one downloaded column with the time
from a second downloaded column. I will be using this to calculate the
length of treatment using another column with date/time entered.

I am currently manually combining, so there is potential for error.

Much thanks.