View Single Post
  #1   Report Post  
gibbylinks
 
Posts: n/a
Default Calculating times

I have two columns. One which calculates the length of time a job will take
to run on a machine, and the other in which we put the time the job will come
off the machine. At present we enter the time off manually. Is it possible to
calculate the time off automatically (to the nearest 1/4 of an hour) if we
put in a start time ?

Thanks