I want to be able to calulate average efficiencies based on a specifie
date range and shift. So I will have 2 different weekly averag
efficiencies (That I plan to chart). This will be a continuou
spreadsheet so I need to be able to specify the dates.
I have explained this in detail, along with the Avg eff. formula, i
the attatched file.
I would appreciate it if anyone would be able to help with a formula o
macro.
Thank
Attachment filename: book1.xls
Download attachment:
http://www.excelforum.com/attachment.php?postid=51817
--
Message posted from
http://www.ExcelForum.com