![]() |
how do I create a graph when using point scale questionnaire using
i am trying to create a progress monitoring type of assessment for students
using a 5 point scale (0 does not perform; 1 performs minimally; 2 moderate performance (i.e. 50% of the time); 3 maximum performance; and 4 independent (i.e. no assistance required). Need to plot each poing based on observed performance (line graph) |
how do I create a graph when using point scale questionnaire using
Select 2 columns, 1st name of students 2nd their score.
Go to draw graph and choose "Column" from "Column type" and clustered Column from Chart sub-type (top-left icon) "Concerned teacher" wrote: i am trying to create a progress monitoring type of assessment for students using a 5 point scale (0 does not perform; 1 performs minimally; 2 moderate performance (i.e. 50% of the time); 3 maximum performance; and 4 independent (i.e. no assistance required). Need to plot each poing based on observed performance (line graph) |
All times are GMT +1. The time now is 02:51 AM. |
Powered by vBulletin® Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
ExcelBanter.com