hi all hope everyones good

i need some help with a project of mine and hoping this forum would be able to find it here for a gas bill calculator

my spread sheet needs to do this.

i want to place the this information as input.

2 dates a from and to date
2 readings( from meter)
a specific number relating to the relevant area and charges
a slot for if the meter is metric or imperial

process

i want the spreadsheet to calulate Kwh from the readings which i know how to do already.

this is the part i need help with once the Kwh has been calculated i need to calculate depending on what months it covers with this

Jan 28.46kwh per day
Feb 31.51 Kwh Per day
mar 8.76 kwh per day
april 9.04 kwh per day
may 1.47 kwh per day
june 1.58 kwh per day
july 1.47 kwh per day
august 1.47 kwh per day
sep 1.52 kwh per day
oct 8.75 keh per day
nov 29.41 kwh per day
dec 28.41 Kwh per day

so say the bill ran from 13/01/08 - 13/03/08 i would need 1 part to calculate the unit over that period so 18 days of jan 28 feb 13 mar and then multiply the outcome by x amount providing the total units are under the total units used.

then the final phase would be to calculate how many units are not accounted for and bill them ay Y ammount

then show the combined ammount and include vat at 5%

please help
  #2   Report Post  
Posted to microsoft.public.excel.newusers
Max Max is offline
external usenet poster
 
Posts: 9,221
Default im new and need help

Just some thoughts on this core part to get you going:
.. say the bill ran from 13/01/08 - 13/03/08 i would need 1 part
to calculate the unit over that period so 18 days of jan 28 feb 13 mar**


To partition it as desired under the correct month/yr col based on start/end
dates, try this sample from my archives:
http://www.freefilehosting.net/download/3e4i0
Apportioning days within a date range under correct month cols.xls

**Think it should rightly be: 19 days under Jan08, 29 days under Feb08,
13 days under Mar08 based on 13/01/08 - 13/03/08 (inclusive)

P/s: Stick to only 1 clear question per post, make it attractive for
responders.
--
Max
Singapore
http://savefile.com/projects/236895
xdemechanik
---


Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On



All times are GMT +1. The time now is 05:16 PM.

Powered by vBulletin® Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 ExcelBanter.
The comments are property of their posters.
 

About Us

"It's about Microsoft Excel"