LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #1   Report Post  
Posted to microsoft.public.excel.newusers
external usenet poster
 
Posts: 3
Default CALCULATING DATES

can anyone help me! i have created a gantt chart, but having the following
problem: column A contains qty of days, column B is start date, column C is
end date. i have set column C so that it adds column A + column B to give me
an end date, but if there is no start date, the end date displays 05/01/00.
A B C
E.g: 6 + (05/12/07) = 10/12/07 ( formula i am using or (C ) is =A+B+1)
6 + ( ) = 05/01/00 ( i want this to remain blank until i
put a start date
in as i have copied the formula down the cells of column C
any ideas???


 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
calculating due dates Ndstc1 Excel Discussion (Misc queries) 2 November 8th 07 08:16 PM
Calculating with dates Henk Excel Discussion (Misc queries) 3 June 13th 07 04:24 PM
Calculating With Dates Clark Excel Discussion (Misc queries) 2 May 13th 07 08:10 AM
Calculating dates alen_re Excel Discussion (Misc queries) 2 January 25th 06 10:32 AM
Calculating number of days between two dates that fall between two other dates [email protected] Excel Discussion (Misc queries) 5 October 26th 05 06:18 PM


All times are GMT +1. The time now is 04:53 PM.

Powered by vBulletin® Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 ExcelBanter.
The comments are property of their posters.
 

About Us

"It's about Microsoft Excel"