LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #1   Report Post  
MJOHNSON
 
Posts: n/a
Default missing deadline

Hi,
I would greatly appreciate if someone could help with the following: I am
trying to get a negative result for a missed deadline.

I have determined the formula when the deadline is met:
deadline (A1) report released (B1) result
01/11/05 6:00 pm 01/11/05 5:45 pm 0:15:00

I used the following formula to generate the above result:
=Mod(A1,1)-MOD(B1,1)+(NETWORKDAYS(B1,A1,Holidays)-1)*3/8

What forumula should be used if the report is released after the deadline;
based on the following parameters: monday-friday 9am-6pm workday; where
holidays are excluded and the deadline time is always 6:00 pm on the deadline
date?

What I'm getting now for a missed deadline is: ############

Thanks for your help!!
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Excel color palette missing colors lstaley_corb Excel Discussion (Misc queries) 0 January 19th 05 10:53 PM
Missing values in Excel Line Chart mw55309 Charts and Charting in Excel 1 January 19th 05 12:10 PM
PivotTable toolbar missing? Mike Silverman Setting up and Configuration of Excel 0 January 11th 05 06:58 AM
how can i get the slope function to ignore missing data? Delmar Excel Discussion (Misc queries) 0 December 2nd 04 05:55 PM
Identify missing criteria Farmer Mark Excel Worksheet Functions 3 November 27th 04 04:23 PM


All times are GMT +1. The time now is 05:50 PM.

Powered by vBulletin® Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 ExcelBanter.
The comments are property of their posters.
 

About Us

"It's about Microsoft Excel"