Home |
Search |
Today's Posts |
#1
Posted to microsoft.public.excel.worksheet.functions
|
|||
|
|||
3-D References and Link Updates
We are using 3-D references at work. So for example we have sheets 00 and 99
as the beginning and end sheets, sheet01 sheet 02 and sheet03 are between them. The data in these sheets links to a summary sheet. In files over 9MB (which is small for my work), we are encountering problems with links not updating. When we move a sheet from outside the range to between 00 and 99, the links stop updating on the summary sheet. Ditto if we duplicate a sheet that is between sheet00 and sheet 99. Is there a problem with excel and 3-D References when the file sizes are over a certain amount? We aren't having problem on smaller files. thanks! ikb |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
Similar Threads | ||||
Thread | Forum | |||
Add link to specific Excel worksheet in HTML Outlook message | Links and Linking in Excel | |||
Breaking the link | New Users to Excel | |||
Changing bulk Link references to different workbook. | Excel Discussion (Misc queries) | |||
How do link to a remote worksheet using the path value in a field? | Links and Linking in Excel | |||
How do link to a remote field but use the path from a stored field | Excel Discussion (Misc queries) |