LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #1   Report Post  
Posted to microsoft.public.excel.worksheet.functions
freestyle
 
Posts: n/a
Default can this function do this?

I am not sure how to make this happen. what I need to do is have sort of
reminder when something needs to be done. However, what I was thinking of is
to use IF statement. There is a date column and drywall access required
column. I am wondering if I can use the drywall access required column which
only has entry of yes and no and use the date column to be 10 days later in
some kind of filter so then all the jobs that are ready can have their
drywall access holes checked out or done. I hope you can tell what I mean.

Thanks Jackie
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Creating a Custom Excel Function to Calculate Gini Coefficients [email protected] Excel Worksheet Functions 3 February 21st 06 10:15 PM
Date & Time mully New Users to Excel 4 May 23rd 05 11:56 AM
Hyperlinks using R[1]C[1] and offset function in its cell referenc Elijah-Dadda Excel Worksheet Functions 0 March 5th 05 03:31 AM
Conversion SVC Excel Worksheet Functions 9 February 28th 05 02:29 PM
HOW CAN I GET OFFICE 2003 EXCEL BASIC TO NEST FUNCTIONS LIKE EXCE. Robert AS Excel Worksheet Functions 4 December 2nd 04 10:49 AM


All times are GMT +1. The time now is 04:15 PM.

Powered by vBulletin® Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 ExcelBanter.
The comments are property of their posters.
 

About Us

"It's about Microsoft Excel"