I'm trying to figure out how to do an overtime calculation for Calif. On the
seventh consecutive workday, (provided all of the previous six days have at least one hour worked) the overtime hours are 8 and the remaining hours worked are paid at double time. However, if any of the previous 6 workdays have 0 hours worked then the calculation is to pay the difference between 40 and the total reg hours for the week as regular, the next 4 hours as ot and any additiional as double time. I've created the two scenarios as separate functions, but can't figure out how to combine them into one formula. |
#2
![]()
Posted to microsoft.public.excel.worksheet.functions
|
|||
|
|||
![]()
Post the two formulae and let's see if we can combine them.
-- HTH RP (remove nothere from the email address if mailing direct) "Kim DuBray" <Kim wrote in message ... I'm trying to figure out how to do an overtime calculation for Calif. On the seventh consecutive workday, (provided all of the previous six days have at least one hour worked) the overtime hours are 8 and the remaining hours worked are paid at double time. However, if any of the previous 6 workdays have 0 hours worked then the calculation is to pay the difference between 40 and the total reg hours for the week as regular, the next 4 hours as ot and any additiional as double time. I've created the two scenarios as separate functions, but can't figure out how to combine them into one formula. |
#3
![]()
Posted to microsoft.public.excel.worksheet.functions
|
|||
|
|||
![]()
Kim
Check out Chip Pearson's timesheet site. http://www.cpearson.com/excel/overtime.htm Gord Dibben Excel MVP On Wed, 7 Dec 2005 15:24:02 -0800, "Kim DuBray" <Kim wrote: I'm trying to figure out how to do an overtime calculation for Calif. On the seventh consecutive workday, (provided all of the previous six days have at least one hour worked) the overtime hours are 8 and the remaining hours worked are paid at double time. However, if any of the previous 6 workdays have 0 hours worked then the calculation is to pay the difference between 40 and the total reg hours for the week as regular, the next 4 hours as ot and any additiional as double time. I've created the two scenarios as separate functions, but can't figure out how to combine them into one formula. |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Calculation Setting in Excel | Excel Discussion (Misc queries) | |||
California Overtime Calculation | Excel Worksheet Functions | |||
How do I use a rounded calculation result in another calculation? | Excel Worksheet Functions | |||
overtime calculation in 1 cell | Excel Worksheet Functions | |||
overtime calculation in 1 cell | Excel Worksheet Functions |