Time change
In my spreedsheet I figure plant hours but the problem I have say my hours
are 7:30 hours. For other calculations I need 7 1/2 hours to read as 7.5. Is there a way to change 7:30 into 7.5 hours thanks in advance Scott |
#2
|
|||
|
|||
Multiply by 24, as time is stored as a fraction on a day.
-- HTH Bob Phillips "scott45" wrote in message ... In my spreedsheet I figure plant hours but the problem I have say my hours are 7:30 hours. For other calculations I need 7 1/2 hours to read as 7.5. Is there a way to change 7:30 into 7.5 hours thanks in advance Scott |
#3
|
|||
|
|||
On Mon, 19 Sep 2005 05:42:03 -0700, "scott45"
wrote: In my spreedsheet I figure plant hours but the problem I have say my hours are 7:30 hours. For other calculations I need 7 1/2 hours to read as 7.5. Is there a way to change 7:30 into 7.5 hours thanks in advance Scott Assuming hour is in A1 try: =HOUR(A1)+MINUTE(A1)/60 HTH __ Richard Buttrey Grappenhall, Cheshire, UK __________________________ |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
Similar Threads | ||||
Thread | Forum | |||
time math | Excel Worksheet Functions | |||
Can series tool change formulas over time when used to copy them | Excel Worksheet Functions | |||
change format for time value | Excel Discussion (Misc queries) | |||
HOW CAN I CHANGE SET-UP ON MULTIPLE SHEETS AT 1 TIME? | Setting up and Configuration of Excel | |||
Calculate change over time | Excel Worksheet Functions |