#1   Report Post  
Bill R
 
Posts: n/a
Default Formula problem

=IF(ISBLANK(Dec!E2),YTD!F12,(IF(ISERROR(SUM(((F32)/(DAYS360(DATE(2004,12,31),S1,FALSE)))*(360))*(F13) ),"",(SUM((F32)/(DAYS360(DATE(2004,12,31),S1,FALSE))))*(360))*(F13 )))

The above formula calculates the "projected" year end sales gross. How do I
get the formula to automatically change the start date based on the actual
hire date of the employee if they are hired some time after the first of the
year?

Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Problem with formula in Excel Bill R Excel Worksheet Functions 3 August 15th 05 03:02 AM
Formula problem on network Philip Reece-Heal Excel Discussion (Misc queries) 2 July 1st 05 01:15 PM
problem with Array Formula OrdOff Excel Worksheet Functions 2 June 30th 05 04:57 PM
Problem with formula Sundaram Iyer Excel Discussion (Misc queries) 0 June 1st 05 12:49 AM
Need a formula for this problem Trying to excel in life but need help Excel Worksheet Functions 1 January 12th 05 11:05 AM


All times are GMT +1. The time now is 02:42 PM.

Powered by vBulletin® Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 ExcelBanter.
The comments are property of their posters.
 

About Us

"It's about Microsoft Excel"